We are coming into the homestretch with our new house. It is almost complete and we cannot wait for it to all come together. We started the process in November and never thought we would be at the stage we are now.
| Claire eyeing up her new room |
| Abby's new room |
| Our master bedroom |
| Our ensuite with the roughed in shower done and the tub will go beside it |
| The wall where are two sinks will go |
| Third bedroom where we will have an office/craft/playroom |
![]() |
| The stairwell with the two windows lots of light coming in |
| Our living room with our fireplace and entertainment centre |
| Our dinning room and kitchen (one big open space) |
| The dining room and living room from the kitchen |
| Mudroom where the washer and dryer will go |
![]() |
| Stairs going up |
![]() |
| Our powder room |
| Our walk out basement |
Next we need to finalize our walk in closet layout and the mud room closet storage. We are still undecided if we will go with Costco's Closet Maid or go with Space Sake.
We also need to meet with someone from Hunter Douglas and pick out window treatments for the house. I think that's important to have in place before we move in, especially in each of the bedrooms.
Yesterday Kyle took a drive to the house during his lunch and saw they had poured the concrete for the driveway and front walkway. He said it looked great and the driveway was nice and wide. They also poured some concrete in-between the front porch and the garage so there wasn't a gap anymore.
| Nice big driveway |
| Front walkway done |
| Concrete is now between the front porch and the garage |



No comments:
Post a Comment